Data gate

What your data unlocks

Energy Agent runs a data gate before any analysis: with the files you have, which of its 25 analyses are ready, which run with a caveat, and what would unlock the rest. This is that gate, on hypothetical inputs. Flip the switches.

19 of 25 analyses ready

Core load 4 of 4

  • Load profiles & baseload
  • Peak demand & TOU breakdown
  • Demand spike detection
  • Demand management (shaving, load shift, battery screen)

Schedule & occupancy 2 of 2

  • Occupancy inference from load ramps
  • Schedule mismatch & ghost loadno schedule uploaded — will infer occupancy from load shape

Weather-dependent 3 of 3

  • HDD/CDD weather regressionpending auto-fetch
  • TOWT baseline (Guideline 14 M&V-grade)
  • Change-point detection (what changed, when)

Meter balance 0 of 1

  • Main-vs-submeter balance (0 submeters)upload submeter interval files to decompose the main meter

Long-horizon & ML 4 of 5

  • Day-type discovery (K-means)
  • Multivariate anomaly detection
  • Baseload drift (statistical)
  • 12-month usage forecast
  • Year-over-year comparisonneeds ≥ 2 calendar years (have 1.0)

Benchmark 1 of 1

  • EUI vs CBECS peers

Power quality 0 of 1

  • Power factor & penalty exposureneeds a kVAR or kVA channel from the meter

Bills & rates 2 of 3

  • Actual blended/energy/demand rates1 bill period(s)
  • Bill YoY, outliers, estimated-read streaksupload two or more bill periods
  • Billed-vs-metered reconciliation

Fault detection (FDD) 1 of 2

  • Whole-building meter rules (MET-01…11)
  • Equipment FDD (85 AHU / VAV / plant / RTU / zone rules)upload BAS/BMS trend exports (Niagara, Metasys, Tracer, APOGEE…)

Economics & capital 2 of 3

  • Capex, payback & decision roadmapcapex from cost library; vendor quotes improve it
  • Capital-plan alignment (repair vs replace)upload an asset register / capital plan on the building page
  • Verified savings (IPMVP Option C)needs you to name an intervention date in chat

Unlock next

In the order Energy Agent suggests them: uploads and profile additions first, then "needs more time".

  1. upload submeter interval files to decompose the main meter
  2. upload two or more bill periods
  3. upload BAS/BMS trend exports (Niagara, Metasys, Tracer, APOGEE…)
  4. upload an asset register / capital plan on the building page
  5. needs ≥ 2 calendar years (have 1.0)
  6. needs a kVAR or kVA channel from the meter
Have this data? The gate runs in minutes.
Send us this data

Mirrors the data gate in Energy Agent as of the current release. Which analyses run on a real building is decided by the gate on the actual files, after the data-quality checks.

See these rules run on your building.

Send twelve months of interval data and a BAS trend export. Energy Agent returns a ranked list of what is wasting money, what each item is worth per year at your tariff, and what to do about it.