RTU-07 · Packaged RTU / DX

High compressor runtime on cool days

On days cool enough that mechanical cooling should barely run, the compressor runs most of the time.

Capacity-basedBAS trendsMedium effort

What does RTU-07 mean?

On days cool enough that mechanical cooling should barely run, the compressor runs most of the time.

Why does it matter?

Points at low charge, a failed economizer, a setpoint problem, or a space sensor in the sun.

What should you do?

Verify economizer operation and changeover, refrigerant charge, and the zone sensor location/setpoint.

How Energy Agent prices a finding

Written by Pelorus Engineering · Brent Waluzak, P.E. (FL), President, Pelorus EngineeringLast updated

Screening-level estimates; confirm with measurement and verification before capital commitment.

Your first building is free.

Send twelve months of interval data, a BAS trend export, or just the bills. You get a screening-level report of what the building is wasting, what that is worth at your tariff, and what to do first. One building per organisation, no sensors, no installation, no commitment.