HP-03 · Heat pumps / VRF

Heat-pump compressor short-cycling

The heat-pump compressor is starting far more often than a healthy unit should.

Capacity-basedBAS trendsMedium effort

What does HP-03 mean?

The heat-pump compressor is starting far more often than a healthy unit should.

Why does it matter?

Inrush, oil return and wear with little useful output.

What should you do?

Check the anti-short-cycle timer, thermostat deadband, refrigerant charge and sizing.

See it happen · interactive 3DSwitch HP-03 on in the interactive 3D hotelOpens the hotel on this fault: watch the rooms, the roof, the pressure and the bill change.

How Energy Agent prices a finding

Written by Pelorus Engineering · Brent Waluzak, P.E. (FL), President, Pelorus EngineeringLast updated
Estimate it

What is short cycling costing?

Estimate the energy wasted on starts, and remember the wear is the bigger bill.

Enter a repair or controls-change cost to see the simple payback.
Avoidable cost per year—Energy —Simple payback Enter a cost to fix to see the payback.

    Each start costs roughly a couple of minutes of full-load energy before the unit is doing useful work. Extra starts above a sane rate, times that penalty, times the unit size and the affected hours. Energy Agent counts the starts from status trends.

    Screening estimate. Energy Agent measures the real fault hours and load from your trends and prices them at your tariff.

    Screening-level estimates; confirm with measurement and verification before capital commitment.

    Your first building is free.

    Send twelve months of interval data, a BAS trend export, or just the bills. You get a screening-level report of what the building is wasting, what that is worth at your tariff, and what to do first. One building per organisation, no sensors, no installation, no commitment.