AHU-FC07 · Air-side AHU · ASHRAE Guideline 36 FC07

SAT low while heating valve is full open

Heating valve is saturated open but SAT still hasn't reached setpoint.

Capacity-basedBAS trendsGuideline 36Medium effort

What does AHU-FC07 mean?

Heating valve is saturated open but SAT still hasn't reached setpoint.

Why does it matter?

Heating capacity is gone — coil is undersized, water-side is starving, or coil is fouled. AHU will deliver cold supply air, zones will reheat to compensate, downstream energy bill grows.

What should you do?

Measure water-side ΔT across the coil (low ΔT = water-side issue). Check HW pump head and pressure-independent control valve setpoint. Inspect coil fins for fouling.

How Energy Agent prices a finding

Written by Pelorus Engineering · Brent Waluzak, P.E. (FL), President, Pelorus EngineeringLast updated

Screening-level estimates; confirm with measurement and verification before capital commitment.

Your first building is free.

Send twelve months of interval data, a BAS trend export, or just the bills. You get a screening-level report of what the building is wasting, what that is worth at your tariff, and what to do first. One building per organisation, no sensors, no installation, no commitment.