MET-03 · Whole-building meter

After-hours operation

Building demand is well above baseload during hours the schedule says it should be off.

Measured at the meterMeter dataMedium effortNeeds schedule

What does MET-03 mean?

Building demand is well above baseload during hours the schedule says it should be off.

Why does it matter?

Every hour over baseload is paid-for conditioning of an empty building. Together with MET-01, the single biggest controllable energy story in most commercial buildings.

What should you do?

Check BMS schedules, tenant override panels, after-hours request logging, and HVAC zone schedules.

How Energy Agent prices a finding

Written by Pelorus Engineering · Brent Waluzak, P.E. (FL), President, Pelorus EngineeringLast updated
Estimate it

What is after-hours operation costing?

Estimate the energy paid for while the building should be off.

Demand above the normal overnight floor.
Enter a repair or controls-change cost to see the simple payback.
Avoidable cost per yearEnergy Simple payback Enter a cost to fix to see the payback.

    Excess load above the night-time floor, times the hours it persists each week, times your rate. Energy Agent measures both the excess and the hours from the meter.

    Screening estimate. Energy Agent measures the real fault hours and load from your trends and prices them at your tariff.

    Screening-level estimates; confirm with measurement and verification before capital commitment.

    See these rules run on your building.

    Send twelve months of interval data and a BAS trend export. Energy Agent returns a ranked list of what is wasting money, what each item is worth per year at your tariff, and what to do about it.