MET-07 · Whole-building meter

Heating + cooling fuel signature overlap

Gas (heating) and electric (cooling) consumption both rise across a shoulder-season period when only one should be active.

Measured at the meterMeter dataMedium effortNeeds weather

What does MET-07 mean?

Gas (heating) and electric (cooling) consumption both rise across a shoulder-season period when only one should be active.

Why does it matter?

Same waste mechanism as the plant-level PLANT-04 fault but visible at the meter when plant-level data isn't available. Often the only signal in older buildings without submetering.

What should you do?

Investigate changeover schedule. Look at simultaneous-heating-cooling at the plant if data exists.

How Energy Agent prices a finding

Written by Pelorus Engineering · Brent Waluzak, P.E. (FL), President, Pelorus EngineeringLast updated

Screening-level estimates; confirm with measurement and verification before capital commitment.

See these rules run on your building.

Send twelve months of interval data and a BAS trend export. Energy Agent returns a ranked list of what is wasting money, what each item is worth per year at your tariff, and what to do about it.