PLANT-07B · Central plant

Boiler short-cycling

The boiler is starting and stopping more frequently than its minimum-runtime safety limit allows.

Capacity-basedBAS trendsMedium effort

What does PLANT-07B mean?

The boiler is starting and stopping more frequently than its minimum-runtime safety limit allows.

Why does it matter?

Short-cycling slashes seasonal efficiency (each start has a purge cycle that dumps heated combustion air up the stack) and accelerates heat-exchanger and ignition-control failure.

What should you do?

Check the boiler's minimum run timer, the supply-water setpoint range, and the staging logic. Oversized boilers are the most common root cause — consider modulating-burner retrofit or condensing replacement.

See it happen · interactive 3DSwitch PLANT-07B on in the interactive 3D campus plantOpens the plant on this fault: watch the chillers, the mains and a year of plant energy change.

How Energy Agent prices a finding

Written by Pelorus Engineering · Brent Waluzak, P.E. (FL), President, Pelorus EngineeringLast updated
Estimate it

What is short cycling costing?

Estimate the energy wasted on starts, and remember the wear is the bigger bill.

Enter a repair or controls-change cost to see the simple payback.
Avoidable cost per year—Energy —Simple payback Enter a cost to fix to see the payback.

    Each start costs roughly a couple of minutes of full-load energy before the unit is doing useful work. Extra starts above a sane rate, times that penalty, times the unit size and the affected hours. Energy Agent counts the starts from status trends.

    Screening estimate. Energy Agent measures the real fault hours and load from your trends and prices them at your tariff.

    Screening-level estimates; confirm with measurement and verification before capital commitment.