What does PLANT-04 mean?
The building is calling for both heating and cooling at the central plant simultaneously.
Why does it matter?
Some buildings genuinely need this (interior cores vs perimeter), but most don't — and when they do, the changeover band and economizer schedule are usually mistuned. Each overlapping hour burns gas and chilled water together.
What should you do?
Audit the heating-cooling changeover schedule. Check whether economizer ride-time has been removed. Look for zones with leaking heating valves driving cooling demand elsewhere.