PLANT-10 · Central plant

Condenser-water reset absent

The condenser-water setpoint never follows the wet-bulb.

Capacity-basedBAS trendsMedium effortNeeds schedule

What does PLANT-10 mean?

The condenser-water setpoint never follows the wet-bulb.

Why does it matter?

Colder condenser water is free chiller efficiency whenever the wet-bulb allows it.

What should you do?

Reset the tower setpoint on wet-bulb plus approach, within the chiller's minimum lift.

See it happen · interactive 3DSwitch PLANT-10 on in the interactive 3D campus plantOpens the plant on this fault: watch the chillers, the mains and a year of plant energy change.

How Energy Agent prices a finding

Written by Pelorus Engineering · Brent Waluzak, P.E. (FL), President, Pelorus EngineeringLast updated

Screening-level estimates; confirm with measurement and verification before capital commitment.