PLANT-16 · Central plant

Pump ΔP reset absent

The secondary pump differential-pressure setpoint is flat for weeks.

Capacity-basedBAS trendsMedium effortNeeds schedule

What does PLANT-16 mean?

The secondary pump differential-pressure setpoint is flat for weeks.

Why does it matter?

Without a valve-position reset the pumps ride the curve at full ΔP all year — often 20–40% of pump energy.

What should you do?

Implement trim-and-respond ΔP reset on the most-open valve; verify the ΔP sensor location.

How Energy Agent prices a finding

Written by Pelorus Engineering · Brent Waluzak, P.E. (FL), President, Pelorus EngineeringLast updated
Estimate it

What is low ΔT costing in pumping?

Estimate the extra pump energy from moving more water than the load needs.

Enter a repair or controls-change cost to see the simple payback.
Avoidable cost per yearEnergy Simple payback Enter a cost to fix to see the payback.

    Pump power rises with the cube of flow. At design ΔT the loop needs only (actual ÷ design) of today’s flow, so pump power at design would be that ratio cubed. Energy Agent measures ΔT and pump power from the plant trends.

    Screening estimate. Energy Agent measures the real fault hours and load from your trends and prices them at your tariff.

    Screening-level estimates; confirm with measurement and verification before capital commitment.

    See these rules run on your building.

    Send twelve months of interval data and a BAS trend export. Energy Agent returns a ranked list of what is wasting money, what each item is worth per year at your tariff, and what to do about it.