AHU-X01 · Air-side AHU

Fighting coils — heating and cooling on at the same time

The heating valve and the cooling valve are both driving open simultaneously on the same AHU.

Physics-basedBAS trendsMedium effort

What does AHU-X01 mean?

The heating valve and the cooling valve are both driving open simultaneously on the same AHU.

Why does it matter?

Every minute of overlap burns gas to make heat that chilled water immediately removes. This is one of the highest-$ pure-waste faults in HVAC and is invisible without per-actuator data.

What should you do?

Check the AHU sequence: is there a deadband between heating and cooling demand? Confirm both valves seat fully closed (a stuck-open valve will look like this). Verify the SAT setpoint and reset logic aren't asking heating and cooling to chase each other.

See it happen · interactive 3DSwitch AHU-X01 on in the interactive 3D schoolOpens the school on this fault: watch the building, the load curve and the bill change.See it happen · interactive 3DSwitch AHU-X01 on in the interactive 3D air handlerOpens the air handler on this fault: watch the dampers, the coils, the boxes and the bill change.

How Energy Agent prices a finding

Written by Pelorus Engineering · Brent Waluzak, P.E. (FL), President, Pelorus EngineeringLast updated
Estimate it

What is heating and cooling at the same time costing?

Estimate the energy spent fighting yourself.

1 ton of cooling is 12 kBtu/h.
Enter a repair or controls-change cost to see the simple payback.
Avoidable cost per year—Energy —Simple payback Enter a cost to fix to see the payback.

    Cooling that only exists to cancel heating (and vice versa) is priced on both sides: chilled water at your kW/ton and rate, heat at your boiler efficiency and gas price, for the hours the overlap lasts. Energy Agent finds the overlap in valve and coil trends.

    Screening estimate. Energy Agent measures the real fault hours and load from your trends and prices them at your tariff.

    Screening-level estimates; confirm with measurement and verification before capital commitment.