What does MET-09 mean? Baseload demand jumped discontinuously up or down on a specific date and didn't return.
Why does it matter? Step changes usually mark an event: equipment failure, retrofit, schedule change. Understanding which it was tells you whether to celebrate or fix.
What should you do? Identify the date, cross-reference with maintenance logs and commissioning records.
How Energy Agent prices a finding
Written by Pelorus Engineering · Brent Waluzak, P.E. (FL), President, Pelorus Engineering Last updated 2026-09-13
Typical evidence A new server room produced a permanent step up in baseload from the day it was commissioned.
From a synthetic demonstration dataset, not a customer building.
At a glance Data Interval meter data Pricing Measured at the meter Effort to fix Medium: usually a controls or mechanical repair Screening-level estimates; confirm with measurement and verification before capital commitment.