MET-10 · Whole-building meter

Meter data integrity issue

The interval data has gaps, frozen values, or implausible jumps that suggest a meter or telemetry problem rather than building behavior.

Diagnostic · data qualityMeter dataMedium effort

What does MET-10 mean?

The interval data has gaps, frozen values, or implausible jumps that suggest a meter or telemetry problem rather than building behavior.

Why does it matter?

Bad meter data makes every other rule on that channel suspect. Fix the data layer before drawing conclusions from analytics.

What should you do?

Check the telemetry pipeline, meter battery, and pulse-output wiring. Backfill gaps from utility bills where possible.

This is a diagnostic rule: Energy Agent surfaces and ranks it as a data quality problem and claims no dollar savings for it, by design.

How Energy Agent prices a finding

Written by Pelorus Engineering · Brent Waluzak, P.E. (FL), President, Pelorus EngineeringLast updated

Screening-level estimates; confirm with measurement and verification before capital commitment.