PLANT-08 · Central plant

Chiller running at very low load

The chiller idles below a quarter of its rated draw for hours.

Capacity-basedBAS trendsMedium effort

What does PLANT-08 mean?

The chiller idles below a quarter of its rated draw for hours.

Why does it matter?

Part-load efficiency is poor and the compressor cycles; a smaller machine, staging or thermal storage would carry it.

What should you do?

Review staging setpoints and minimum-load unloading; consider a pony chiller or free cooling for light loads.

See it happen · interactive 3DSwitch PLANT-08 on in the interactive 3D campus plantOpens the plant on this fault: watch the chillers, the mains and a year of plant energy change.

How Energy Agent prices a finding

Written by Pelorus Engineering · Brent Waluzak, P.E. (FL), President, Pelorus EngineeringLast updated

Screening-level estimates; confirm with measurement and verification before capital commitment.