What does PLANT-08 mean? The chiller idles below a quarter of its rated draw for hours.
Why does it matter? Part-load efficiency is poor and the compressor cycles; a smaller machine, staging or thermal storage would carry it.
What should you do? Review staging setpoints and minimum-load unloading; consider a pony chiller or free cooling for light loads.
How Energy Agent prices a finding
Written by Pelorus Engineering · Brent Waluzak, P.E. (FL), President, Pelorus Engineering Last updated 2026-09-13
Typical evidence A chiller idling at a small fraction of capacity overnight for three weeks.
From a synthetic demonstration dataset, not a customer building.
At a glance Data BAS trend export Pricing Capacity-based Effort to fix Medium: usually a controls or mechanical repair Screening-level estimates; confirm with measurement and verification before capital commitment.